SAFETY RULES UNDER PREPARATION/REVISION |
PRESENT STATUS |
NEXT STEP |
AVAILABLE DOCUMENTS |
SR-A |
Incidents and Threats |
Draft approved & presented to DSO's, Staff Association |
Preparation of Final Draft |
|
SP-A1 |
Command, intervention coordination, information dissemination and special follow-up measures for emergencies |
Draft approved & presented to DSO's, Staff Association |
Preparation of Final Draft |
|
SR-HS |
Health and Occupational Safety at Workplace |
Draft approved & presented to DSO's, Staff Association |
Preparation of Final Draft |
|
GSI-HS1 |
Health and Occupational Safety Requirements for Workplaces |
Draft approved & presented to DSO's, Staff Association |
Preparation of Final Draft |
|
SR-F |
Fire Safety for Structures |
Draft approved & presented to DSO's, LS, Staff Association |
Preparation of Final Draft |
|
GSI-C1 |
Prevention and protection measures |
Draft approved & presented to DSO's, Staff Association |
Preparation of Final Draft |
|
GSI-C5 |
Air monitoring |
Draft approved & presented to DSO's, Staff Association |
Preparation of Final Draft |
|
GSI-C6 |
Carcinogens, mutagens or toxic to reproduction substances (genome) |
Draft approved |
Presentation of the Draft to DSO's, LS, Staff Association |
|
SR-B |
Biological Agents |
Draft approved |
Presentation of the Draft to DSO's, LS, Staff Association |
|
GSI-B1 |
The control of Legionella bacteria in water systems |
Preparation of Draft |
Approve Draft |
|
SR-E |
Environmental Protection |
Draft approved |
Presentation of the Draft to DSO's, LS, Staff Association |
|
GSI-M2 |
Standard pressure equipment |
Preparation of Draft |
Approval of the Draft |
|
SSI-M21 |
Double layer vessels for the production or storage of liquefied gas at cryogenic temperature - Inspection and testing |
Preparation of Draft |
Approval of the Draft |
|
SSI-M22 |
Refrigerating units - Inspection and testing |
Preparation of Draft |
Approval of Draft |
|
SSI-M23 |
Pressure equipment - Pneumatic proof testing |
Preparation of Draft |
Approval of Draft |
|
SR-WO |
Work Organization |
Preparation of Draft |
Approval of Draft |
|
SR-SS |
Safety Systems |
Preparation of Draft |
Approval of Draft |
|
GSI-SS |
Safety Alarms |
Preparation of Draft |
Approval of Draft |
|